Description
More Info
Product Description
This test is conducted to determine if there is communication between the two zones isolated by a packer. Based on a 24 hour test, this test includes a detailed report and associated fieldwork (fluid levels and casing/tubing pressures are recorded).
Additional charges will apply if:
- PIT is required to supply a pressure tank
- the duration of the test exceeds 24 hours (due to AER regulations)