Loading the content...
Navigation

Plunger Lift Inspection

Return to Previous Page
Description

Product Description

Standard Inspection Service
  • includes surfacing plunger and completing full measurement check; replacement upon approval
  • visual inspection on outside body of lubricator and cap spring; replacement upon approval
  • mechanical/electrical inspection of controller and related components
  • written documentation and data recording in PIT’s database est.2000
  • excel summary for specific area provided and follow up of recommended repairs
  • 1-man crew/well, no mileage charge, includes 1 hour, charge for additional hours (usually not needed)
Full Inspection Service
  • includes surfacing plunger and completing full measurement check; replacement upon approval
  • visual inspection on the inside bore and outside body of lubricator and cap spring; replacement upon approval
  • mechanical/electrical inspection of controller and related components
  • written documentation and data recording in PIT’s database est.2000
  • excel summary for specific area provided and follow up of recommended repairs
  • 2-man crew on full inspections are mandatory for safety reasons/crew, no mileage charge, includes 1 hour, charge for additional hours (usually not needed)
Sour Well Inspection Services
  • Full or Standard
  • includes surfacing plunger and completing full measurement check; replacement upon approval
  • visual inspection on inside bore or outside body (depending on customer request) of lubricator and cap spring; replacement upon approval
  • mechanical/electrical inspection of controller and related components
  • written documentation and data recording in PIT’s database est. 2000
  • excel summary for specific area provided and follow up of recommended repairs
  • 2-man crew on Sour Inspections are mandatory for safety reasons/crew, no mileage charge, includes 1 hour, charge for additional hours (usually not needed)
  • all safety equipment required/rented/maintenance costs, damages will be charged to the producer such as Air Trailers, SCBA Units; personal monitors are included at no charge
More Info
Recommended Inspection Intervals
Standard Inspections should be performed at a minimum rate of every 6 months on SWEET Gas locations; for SOUR Gas locations PIT recommends starting with a quarterly location and then move to semi-annual if possible. Full Inspections should be performed at a minimum rate of every 12 months on SWEET Gas locations or Threaded Lubricators; for SOUR Gas locations or Flanged Lubricators PIT recommends starting with yearly inspections and then move to every two or more as required by historical data. Sour Wells
  • PIT recommends starting Standard Inspections quarterly and then moving to semi-annually if possible
  • PIT recommends starting Full Inspections yearly and then moving to every two or more as required by historical data

Related Products

Quick View

Annual Pressure Surveys

Gain valuable knowledge about your reservoir from surface, empower your operations staff and more.
AWS 500 percent increase oilrate inflow monitoring Quick View

Well Evaluations

A service offered by PIT to help ensure that the best decisions are made when optimizing a well; closely analyzes the different options of plunger lift systems, different sizes of flow tube, etc. for your application.  Evaluations allow us to examine the well and ensure all proper optimization solutions are considered and analyzed.  Reports can also identify where to land down hole equipment.
Frac Monitoring Quick View

Frac Monitoring

Allows Frac Van staff and engineers across the globe or in office towers to see what is happening to nearby wells as they pump. A growing service for PIT as regulation and concern around Fracking grows.  Offset well monitoring service during frac simulations.  Equipment used is the Calscan gauges with "Real Time" communication (similar to PSAT technology) allowing Frac Van staff and engineers across the globe or in offices to see what is happening to nearby wells as they pump. PIT uses a precision low power data recorder with integrated sensors used to measure and log pressure and temperature.
Training Trailer Quick View

Optimization Training

pdfdwn-a-64 PIT is proud to offer training services for producers who are interested in continuing their education, awareness, and safe operation of optimization products and services.  Training can be generic or very specific depending on your level of operations experience and understanding of well optimization. PIT will also look specifically at your operations, and equipment, and then tailor a training session to your needs.
ENJOY FISHING? OUR MACHINING SHOP MANUFACTURES AN AMAZING FISHING REELTHE TRAVELLER
+