Loading the content...
Navigation

Heavy Hitter Bottom Hole Spring Assembly (BHSA)

Return to Previous Page
Description

Product Description

Features
    BHS Assembly (Patent Pending)

  • old compression rate of 265 psi/in2: total compression of coils equaled ~800
  • new style is about 3 inches less of inconel coil, but more travel per square inch at 310 psi/in2
  • accomplished by adding the bellville washer kit in the cage, giving the spring a total compression rating of 3100 psi/in2
  • the spring is designed to engage ~70% of the washer pack for total compression
Specifications

Related Products

Plunger Inspections Quick View

Plunger Lift Inspection

PIT feels that the value of regular inspections and effective operations in your well optimization is more important now than it may have ever been. PIT offers both standard and full inspections on wells.
Pacemaker Plunger and Ball Quick View

PaceMaker Plunger Lift System

pdfdwn-a-64Industry leading solution for liquid loaded horizontal well applications. The PIT PaceMaker Plunger Lift System utilizes a proven, patented, two-piece plunger design. The large bypass area of the plunger, coupled with high strength materials and other proprietary system components, allows production companies to increase production and recoverable reserves. Plunger and ball combos are available in titanium, steel and other specialty materials.  Fluid and gas rates determine plunger length and weight requirements.
Quick View

Gas Lift

pdfdwn-a-64To keep gas wells from loading by either intermittent or continuous flow gas lift or to lift wells with deviated and horizontal wellbores. PIT Gas Lift is a complete line of wireline and tubing retrievable gas lift equipment backed by years of experience in manufacturing and service. PIT Gas Lift has the right system for your well and provides exceptional value and flexibility in a full spectrum of applications. PIT technical experts are equipped with NODAL and advanced well design software capable of providing the most efficient gas lift solution to optimize your wells' production. PIT engineering staff can provide training, troubleshooting, and optimization support for any gas lift system.