D-13 Suspended Lease Inspections

Return to Previous Page
Description

Product Description

PIT performs Low and Medium Risk D13 Inspections for client’s suspended wells.  This AER required annual test helps reduce client risk, while protecting the environment.  Photos and reports included, equipment documented, well pressures, chain and lock wellhead, signage repair and minor stain clean up included.

Medium Risk D13 additionally required our Pressure Trailer to pressure test the tubing and casing downhole suspension plugs.

More Info

Related Products

Packer Pressure 2 Quick View

Packer Isolation Testing

AER Annual required test for all types of Injection Wells.  The down hole packer is pressure tested using PIT's portable pressure trailers and recorded.
Quick View

Annual Pressure Surveys

Gain valuable knowledge about your reservoir from surface, empower your operations staff and more.
Gas Migration Testing Quick View

Gas Migration Testing

Gas Migration Tests are conducted to determine if the well has a gas migration problem. For the purpose of this test, gas migration can be defined as the movement of methane or other gases from a subsurface zone to surface through a barrier that should prevent it's movement, whether this barrier is natural (overburden, shale) or artificial (cement sheath, external casing packed, pipe joints, plug, etc.).
Premier Integrated Technologies Quick View

Segregation Testing for 2 Zones Separated by a Packer

This test is conducted to determine if there is communication between the two zones isolated by a packer.  Based on a 24 hour test, this test includes a detailed report and associated fieldwork (fluid levels and casing/tubing pressures are recorded).